diff --git a/doc/release/monthly.md b/doc/release/monthly.md
deleted file mode 100644
index cfe01896d8f..00000000000
--- a/doc/release/monthly.md
+++ /dev/null
@@ -1,212 +0,0 @@
-# Monthly Release
-
-NOTE: This is a guide used by the GitLab B.V. developers.
-
-It starts 7 working days before the release.
-The release manager doesn't have to perform all the work but must ensure someone is assigned.
-The current release manager must schedule the appointment of the next release manager.
-The new release manager should create overall issue to track the progress.
-
-## Release Manager
-
-A release manager is selected that coordinates all releases the coming month, including the patch releases for previous releases.
-The release manager has to make sure all the steps below are done and delegated where necessary.
-This person should also make sure this document is kept up to date and issues are created and updated.
-
-## Take vacations into account
-
-The time is measured in weekdays to compensate for weekends.
-Do everything on time to prevent problems due to rush jobs or too little testing time.
-Make sure that you take into account any vacations of maintainers.
-If the release is falling behind immediately warn the team.
-
-## Create an overall issue and follow it
-
-Create issue for GitLab CE project(internal). Name it "Release x.x.x" for easier searching.
-Replace the dates with actual dates based on the number of workdays before the release.
-All steps from issue template are explained below
-
-```
-Xth: (7 working days before the 22nd)
-
-- [ ] Code freeze
-- [ ] Update the CE changelog (#LINK)
-- [ ] Update the EE changelog (#LINK)
-- [ ] Update the CI changelog (#LINK)
-- [ ] Triage the omnibus-gitlab milestone
-
-Xth: (6 working days before the 22nd)
-
-- [ ] Merge CE master in to EE master via merge request (#LINK)
-- [ ] Determine QA person and notify this person
-- [ ] Check the tasks in [how to rc1 guide](howto_rc1.md) and delegate tasks if necessary
-- [ ] Create CE, EE, CI RC1 versions (#LINK)
-
-Xth: (5 working days before the 22nd)
-
-- [ ] Do QA and fix anything coming out of it (#LINK)
-- [ ] Close the omnibus-gitlab milestone
-- [ ] Prepare the blog post (#LINK)
-
-Xth: (4 working days before the 22nd)
-
-- [ ] Update GitLab.com with rc1 (#LINK) (https://dev.gitlab.org/cookbooks/chef-repo/blob/master/doc/administration.md#deploy-the-package)
-- [ ] Update ci.gitLab.com with rc1 (#LINK) (https://dev.gitlab.org/cookbooks/chef-repo/blob/master/doc/administration.md#deploy-the-package)
-- [ ] Create regression issues (CE, CI) (#LINK)
-- [ ] Tweet about rc1 (#LINK)
-
-Xth: (3 working days before the 22nd)
-
-- [ ] Merge CE stable branch into EE stable branch
-
-Xth: (2 working days before the 22nd)
-
-- [ ] Check that everyone is mentioned on the blog post (the reviewer should have done this one working day ago)
-- [ ] Check that MVP is added to the mvp page (source/mvp/index.html in www-gitlab-com)
-
-Xth: (1 working day before the 22nd)
-
-- [ ] Create CE, EE, CI stable versions (#LINK)
-- [ ] Create Omnibus tags and build packages
-- [ ] Update GitLab.com with the stable version (#LINK)
-- [ ] Update ci.gitLab.com with the stable version (#LINK)
-
-22nd:
-
-- [ ] Release CE, EE and CI (#LINK)
-
-```
-
-- - -
-
-## Code Freeze
-
-Stop merging code in master, except for important bug fixes
-
-## Update changelog
-
-Any changes not yet added to the changelog are added by lead developer and in that merge request the complete team is
-asked if there is anything missing.
-
-There are three changelogs that need to be updated: CE, EE and CI.
-
-## Create RC1 (CE, EE, CI)
-
-[Follow this How-to guide](howto_rc1.md) to create RC1.
-
-## Prepare CHANGELOG for next release
-
-Once the stable branches have been created, update the CHANGELOG in `master` with the upcoming version, usually X.X.X.pre.
-
-## QA
-
-Create issue on dev.gitlab.org `gitlab` repository, named "GitLab X.X QA" in order to keep track of the progress.
-
-Use the omnibus packages created for RC1 of Enterprise Edition using [this guide](https://dev.gitlab.org/gitlab/gitlab-ee/blob/master/doc/release/manual_testing.md).
-
-**NOTE** Upgrader can only be tested when tags are pushed to all repositories. Do not forget to confirm it is working before releasing. Note that in the issue.
-
-#### Fix anything coming out of the QA
-
-Create an issue with description of a problem, if it is quick fix fix it yourself otherwise contact the team for advice.
-
-**NOTE** If there is a problem that cannot be fixed in a timely manner, reverting the feature is an option! If the feature is reverted,
-create an issue about it in order to discuss the next steps after the release.
-
-## Update GitLab.com with RC1
-
-Use the omnibus EE packages created for RC1.
-If there are big database migrations consider testing them with the production db on a VM.
-Try to deploy in the morning.
-It is important to do this as soon as possible, so we can catch any errors before we release the full version.
-
-## Create a regressions issue
-
-On [the GitLab CE issue tracker on GitLab.com](https://gitlab.com/gitlab-org/gitlab-ce/issues/) create an issue titled "GitLab X.X regressions" add the following text:
-
-This is a meta issue to discuss possible regressions in this monthly release and any patch versions.
-Please do not raise issues directly in this issue but link to issues that might warrant a patch release.
-The decision to create a patch release or not is with the release manager who is assigned to this issue.
-The release manager will comment here about the plans for patch releases.
-
-Assign the issue to the release manager and at mention all members of gitlab core team. If there are any known bugs in the release add them immediately.
-
-## Tweet about RC1
-
-Tweet about the RC release:
-
-> GitLab x.x.0.rc1 is out. This release candidate is only suitable for testing. Please link regressions issues from LINK_TO_REGRESSION_ISSUE
-
-## Prepare the blog post
-
-1. Start with a complete copy of the [release blog template](https://gitlab.com/gitlab-com/www-gitlab-com/blob/master/doc/release_blog_template.md) and fill it out.
-1. Make sure the blog post contains information about the GitLab CI release.
-1. Check the changelog of CE and EE for important changes.
-1. Also check the CI changelog
-1. Add a proposed tweet text to the blog post WIP MR description.
-1. Create a WIP MR for the blog post
-1. Ask Dmitriy (or a team member with OS X) to add screenshots to the WIP MR.
-1. Decide with core team who will be the MVP user.
-1. Create WIP MR for adding MVP to MVP page on website
-1. Add a note if there are security fixes: This release fixes an important security issue and we advise everyone to upgrade as soon as possible.
-1. Create a merge request on [GitLab.com](https://gitlab.com/gitlab-com/www-gitlab-com/tree/master)
-1. Assign to one reviewer who will fix spelling issues by editing the branch (either with a git client or by using the online editor)
-1. Comment to the reviewer: '@person Please mention the whole team as soon as you are done (3 workdays before release at the latest)'
-
-## Create CE, EE, CI stable versions
-
-Get release tools
-
-```
-git clone git@dev.gitlab.org:gitlab/release-tools.git
-cd release-tools
-```
-
-Bump version, create release tag and push to remotes:
-
-```
-bundle exec rake release["x.x.0"]
-```
-
-This will create correct version and tag and push to all CE, EE and CI remotes.
-
-Update [installation.md](/doc/install/installation.md) to the newest version in master.
-
-
-## Create Omnibus tags and build packages
-
-Follow the [release doc in the Omnibus repository](https://gitlab.com/gitlab-org/omnibus-gitlab/blob/master/doc/release.md).
-This can happen before tagging because Omnibus uses tags in its own repo and SHA1's to refer to the GitLab codebase.
-
-## Update GitLab.com with the stable version
-
-- Deploy the package (should not need downtime because of the small difference with RC1)
-- Deploy the package for ci.gitlab.com
-
-## Release CE, EE and CI
-
-__1. Publish packages for new release__
-
-Update `downloads/index.html` and `downloads/archive/index.html` in `www-gitlab-com` repository.
-
-__2. Publish blog for new release__
-
-Doublecheck the everyone has been mentioned in the blog post.
-Merge the [blog merge request](#1-prepare-the-blog-post) in `www-gitlab-com` repository.
-
-__3. Tweet to blog__
-
-Send out a tweet to share the good news with the world.
-List the most important features and link to the blog post.
-
-Proposed tweet "Release of GitLab X.X & CI Y.Y! FEATURE, FEATURE and FEATURE <link-to-blog-post> #gitlab"
-
-Consider creating a post on Hacker News.
-
-## Release new AMIs
-
-[Follow this guide](https://dev.gitlab.org/gitlab/AMI/blob/master/README.md)
-
-## Create a WIP blogpost for the next release
-
-Create a WIP blogpost using [release blog template](https://gitlab.com/gitlab-com/www-gitlab-com/blob/master/doc/release_blog_template.md).