Welcome to mirror list, hosted at ThFree Co, Russian Federation.

gitlab.com/gitlab-org/gitlab-foss.git - Unnamed repository; edit this file 'description' to name the repository.
summaryrefslogtreecommitdiff
diff options
context:
space:
mode:
authorGitLab Bot <gitlab-bot@gitlab.com>2022-08-24 03:12:25 +0300
committerGitLab Bot <gitlab-bot@gitlab.com>2022-08-24 03:12:25 +0300
commitd5fdc905ae426ab5c7788f8ef56070c35360b1d3 (patch)
tree2c22aa90b3988af49c2f08e7346273c57226887c /doc/user/group/iterations
parentde5fc582771ba7e2dc6e1c783ce8ee417fbe6788 (diff)
Add latest changes from gitlab-org/gitlab@master
Diffstat (limited to 'doc/user/group/iterations')
-rw-r--r--doc/user/group/iterations/index.md6
1 files changed, 3 insertions, 3 deletions
diff --git a/doc/user/group/iterations/index.md b/doc/user/group/iterations/index.md
index a5102d27302..7a1db41e4f8 100644
--- a/doc/user/group/iterations/index.md
+++ b/doc/user/group/iterations/index.md
@@ -203,7 +203,7 @@ To create an iteration cadence:
1. Select **New iteration cadence**.
1. Enter the title and description of the iteration cadence.
1. To manually manage the iteration cadence, clear the **Enable automatic scheduling** checkbox and skip the next step.
-1. Complete the required fields to use automatic scheduling.
+1. Complete the required fields to use automatic scheduling.
- Select the automation start date of the iteration cadence. Iterations will be scheduled to
begin on the same day of the week as the day of the week of the start date.
- From the **Duration** dropdown list, select how many weeks each iteration should last.
@@ -241,7 +241,7 @@ doesn't delete the eight existing upcoming iterations.
1. Complete the required fields **Duration**, **Upcoming iterations**, and **Automation start date**.
For **Automation start date**, you can select any date that doesn't overlap with the existing open iterations.
If you have upcoming iterations, the automatic scheduling adjusts them appropriately to fit
-your chosen duration.
+your chosen duration.
1. Select **Save changes**.
When you want to manage your iterations cadence manually again, edit your cadence and uncheck the **Enable automatic scheduling** checkbox.
@@ -267,7 +267,7 @@ after the conversion you have the following iterations:
- Monday, April 18 - Sunday, April 24 (upcoming)
- Monday, April 25 - Sunday, May 1 (upcoming)
-Your existing upcoming iteration "Tuesday, April 12 - Friday, April 15"
+Your existing upcoming iteration "Tuesday, April 12 - Friday, April 15"
is changed to "April 18 - Sunday, April 24".
An additional upcoming iteration "April 25 - Sunday, May 1" is scheduled